Steaming

Once Through Steam Generators (OTSG)
Our experience with operating OTSG equipment spans two decades, meaning we have extensive insight into managing control, instrumentation and electrical maintenance and repairs.
At BadrEOR we supply OTSG equipment and refurbishment, as well as providing valve repairs and motor rewinding.

Heated Early Production Facilities
Our early production calibrated gauge tanks enable evacuation of tested fluids from the well at elevated temperatures and provide water content measuring.
Heated early production facilities simplify the EOR process for cost and time efficiency.